    9292Adrian - There is feedback that PCA & FIATECH want to strengthen this ongoing relationship, but as yet no formal arrangement agreed. 
    9393 
    94 Gord - Now I'm interested, but what do I do next. (Prominent link to Avalon currently). The how to stuff is really beyond the primer now .... where is the home for this. Yes, these pages ... under what was IDS-ADI (Avalon is a time-limited project) ... continue with IDS-ADI branding for now. (Noted security certificate problem is still there.) 
     94Gord - Now I'm interested, but what do I do next. (Prominent link to Avalon currently). The how to stuff is really beyond the primer now .... where is the home for this. Yes, these pages ... under what was IDS-ADI (Avalon is a time-limited project) ... continue with IDS-ADI branding for now. (Noted security certificate problem is still there.) Start at the IDS-ADI top page. 
     95 
     96Specific content progress ... 
     97 
     98Bechtel / Emerson (Dow & Fluor originally too, and maybe again later)[[BR]]Content - deep slice vertically (Emerson - one instrument modelling in detail - classes and templates)/ and thin horizontal layer (Bechtel - broad functional needs across instruments / lists / datasheets). Looking like 900 items created. Maybe worth a review of that content ? 
     99 
     100Should the Thursday modelling meeting be re-adopted as the umbrella IDS-ADI modelling scope ? OK as a wider agenda even if participants needs driven circumstantially by projects - default agenda. 
     101 
     102Proteus - producing agreed spreadsheet formats for content generated as proposals. Up to 16 vendors now signed up (most now active). Probably of the order of 1500 classes involved - many alraedy exist. (Not actually using the RDLFacade endpoint IDGenerator... Mohammed is working on it.) 
     103 
     104IDGenerator at RDLFacade.org is being used - and its working - important that it's adoption, robustness and scalability is picked-up in the OperationalRDL management. (This is currently seen as a PCA endpoint.) 
     105 
     106BIDG - No report today. 
     107 
     108Primer / How to / High Level IDS-ADI Documentation / Business Case-studies.[[BR]]Gathering case studies - Robin few weeks ago, now Ian (recently, yesterday), list of reference projects (frrom the S/W vendors) ... to follow up. Lessons learned too. "How to represent legacy schema". Need to link this to the "methodology" and "simplification" agendas too. 
    95109 
    96110[https://www.posccaesar.org/wiki/IdsAdiAvalonCollab Content Wiki Index] 