Timeline
04/07/11:
- 14:30 Changeset [178] by
-
renamed the file so the name is in english also
- 14:30 Changeset [177] by
-
Found a good Freeware that converts XML with XSL-FO. Where ...
- 12:42 Changeset [176] by
- 10:32 Changeset [175] by
-
created a new pdf using XMl and XSL using rendeX's XEP for Windows Trial
04/06/11:
- 15:36 Changeset [174] by
-
did some changes so the XSD will work with the old XML test report.
- 14:10 Changeset [173] by
-
Fixed some spacing errors. added a bit more space before the cement fluid ...
- 13:40 Changeset [172] by
-
changed the rigType to fixedRig and changed the documentation for this ...
- 13:28 Changeset [171] by
-
Fixed the errors and design faults
- 13:27 Changeset [170] by
-
fixed the pdf report with the new suggestions
- 10:48 Changeset [169] by
- 10:47 Changeset [168] by
- 08:26 Changeset [167] by
-
fixed the PDF bug
04/05/11:
- 16:52 Changeset [166] by
-
Added presentation for Coregroup meeting
- 15:09 Changeset [165] by
- 14:24 Changeset [164] by
-
Added Magnes updates to ConceptsAndDefinitions?.xls
- 10:27 Changeset [163] by
- 09:37 Changeset [162] by
- 09:35 Changeset [161] by
03/30/11:
- 16:11 Changeset [160] by
-
updated the pdf files
- 10:33 Changeset [159] by
-
Did changes for both HTML report and PDF report so it is closer to how ...
03/29/11:
- 15:36 Changeset [158] by
-
Additions made by Magne
- 15:13 Changeset [157] by
- 08:38 Changeset [156] by
-
updated files for pdf report.
03/25/11:
- 16:12 Changeset [155] by
-
Changed to Float held and Plug bump indicator
03/24/11:
03/22/11:
- 15:24 Changeset [153] by
-
fixed the cementjobtype
- 15:15 Changeset [152] by
-
fixed some of the changes regarding xsl and the report view
03/16/11:
- 15:43 Changeset [151] by
-
changed some of the field to remove the redundancy
- 15:22 Changeset [150] by
-
Created a pdf sample report, and done some changes on the xml for the html ...
- 12:15 Changeset [149] by
03/15/11:
- 13:21 Changeset [148] by
-
Added description of rigtype