Rubin

Rubin Oil Company

Rubin Field

Rubin Monthly Production

Report date : 2008-02

Issue date : 2008-02-11

Approved by : JIR , Supervisor

Approved date : 2008-02-10

 

 

 

Installation Fiscal Quantities

 

Description

Volume

Mass

 

Sm3

Tonnes

Rubin A – Oil Export – Gross oil

256 000

210450

Rubin  A– Gas Export – Gas

1 650 000

78 000

 

 

 

 

Installation Allocated Production

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Rubin A – Oil Production- Net Oil

252 500

208 750

920,66

Rubin A – Total Gas Production - Gas

2 650 000

78 000

0,87

Rubin A – Total Water Production – Water

456 352

88 246

1029,00

Rubin B – Oil Production- Net Oil

252 500

208 750

920,66

Rubin B – Total Gas Production - Gas

2 650 000

78 000

0,87

Rubin B – Total Water Production – Water

456 352

88 246

1029,00

Rubin C – Oil Production- Net Oil

252 500

208 750

920,66

Rubin C – Total Gas Production - Gas

2 650 000

78 000

0,87

Rubin C – Total Water Production – Water

456 352

88 246

1029,00

 

Installation Allocated Injection

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Rubin C – Total Water Injection - Water

252 500

208 750

820,66

Rubin C – Total Gas Injection - Gas

2 650 000

78 000

0,87

Rubin B – Total Condensate Injection – Condensate

456 352

88 246

1029,00

 

Installation Allocated Flare

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Rubin A – Total Gas Flare - Gas

2 650 000

78 000

0,87

Rubin B – Total Gas Flare - Gas

2 650 000

78 000

0,87

Rubin C – Total Gas Flare - Gas

2 650 000

78 000

0,87

Rubin C – Total Condensate Flare – Condensate

456 352

88 246

0,85

 

Installation Allocated Consumption

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Rubin A – Total Gas Fuel - Gas

50 000

78 000

0,87

Rubin B – Total Gas Fuel - Gas

50 000

78 000

0,87

Rubin C – Total Condensate Fuel – Condensate

352

46

0,65

 

Installation Consumption

 

Description

Volume

Mass

Density

 

L

Tonnes

Kg/Sm3

Rubin A – Total Diesel Fuel - Diesel

650

 

 

 

Installation Allocated cold Vent

 

Description

Volume

Mass

Density

 

L

Tonnes

Kg/Sm3

Rubin A – Total Venting Gas - Gas

650 000

 

 

 

Installation Tank Stock

 

Description

Volume

Mass

Density

Energy

 

Sm3

Tonnes

Kg/Sm3

MJ

Rubin A – Tota Oil net

2 650 000

2 555 567

582,87

56 685 311

Rubin A – Total Gas

2 650 000

2 555 567

582,87

56 685 311

Rubin B – Tota Oil net

2 650 000

2 555 567

582,87

56 685 311

Rubin B – Total Gas

 2 650 000

2 555 567

582,87

56 685 311

Rubin C – Tota Oil net

2 650 000

2 555 567

582,87

56 685 311

Rubin C – Total Gas

650 000

2 555 567

582,87

56 685 311

 

Field Fiscal Quantities

 

Description

Volume

Mass

 

Sm3

Tonnes

Rubin – Oil Export – Gross oil

256 000

210450

Rubin – Gas Export – Gas

1 650 000

78 000

 

 

Field Allocated Production

 

Description

Volume

Mass

Density

Energy

 

Sm3

Tonnes

Kg/Sm3

MJ

Rubin – Oil net

2 650 000

2 555 567

582,87

56 685 311

Rubin – Butane

2 650 000

2 555 567

582,87

56 685 311

Rubin – Ethane

2 650 000

2 555 567

582,87

56 685 311

Rubin – ISO Butane

2 650 000

2 555 567

582,87

56 685 311

Rubin – gas

2 650 000

2 555 567

582,87

56 685 311

Rubin – Prophane

2 650 000

2 555 567

582,87

56 685 311

 

Field Allocated Injection

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Rubin – Total Water Injection - Water

352 500

228 750

815,35

Rubin – Total Gas Injection - Gas

3 650 000

878 000

0,87

Rubin – Total Condensate Injection – Condensate

456 352

88 246

1029,00

 

Field Tank Stock

 

Description

Owner

Volume

Mass

Density

Energy

 

 

Sm3

Tonnes

Kg/Sm3

MJ

Rubin – Tota Oil net

 

2 650 000

2 555 567

582,87

56 685 311

Rubin – Total Butane

 

2 650 000

2 555 567

582,87

56 685 311

Rubin – Total Ethane

 

2 650 000

2 555 567

582,87

56 685 311

Rubin – Total ISO Butane

 

 2 650 000

2 555 567

582,87

56 685 311

Rubin – Total Prophane

 

2 650 000

2 555 567

582,87

56 685 311

Rubin – Oil net

ENI

650 000

2 555 567

582,87

56 685 311

Rubin – Butane

ENI

650 000

2 555 567

582,87

56 685 311

Rubin – Ethane

ENI

650 000

2 555 567

582,87

56 685 311

Rubin – ISO Butane

ENI

650 000

2 555 567

582,87

56 685 311

Rubin – Prophane

ENI

650 000

2 555 567

582,87

56 685 311

Rubin – Oil net

StatoilHydro

450 000

2 555 567

582,87

56 685 311

Rubin – Butane

StatoilHydro

  450 000

2 555 567

582,87

56 685 311

Rubin – Ethane

StatoilHydro

450 000

2 555 567

582,87

56 685 311

Rubin – ISO Butane

StatoilHydro

450 000

2 555 567

582,87

56 685 311

Rubin – Prophane

StatoilHydro

450 000

2 555 567

582,87

56 685 311

Rubin – Oil net

EXXON

850 000

2 555 567

582,87

56 685 311

Rubin – Butane

EXXON

850 000

2 555 567

582,87

56 685 311

Rubin – Ethane

EXXON

850 000

2 555 567

582,87

56 685 311

Rubin – ISO Butane

EXXON

850 000

2 555 567

582,87

56 685 311

Rubin – Prophane

EXXON

850 000

2 555 567

582,87

56 685 311

 

 

 

 

 

 

 

Field Gas Sale

 

 

Sales administrator ??

Description

Owner

Sale date

Byer

Volume

Energy

 

 

 

 

Sm3

MJ

Rubin – Total Gas Sale - Gas

ENI

01- Feb-2008

RUHRGAS

555 567

685 311

Rubin – Total Gas Sale - Gas

BP

02- Feb-2008

GazDeFrance

555 567

685 311

 

Field Production lifted by tanker

 

Description

Cargo no

Bill of Lading date

Owner

Dest

Volume

Mass

Density

 

 

 

 

 

Sm3

Tonn

Kg/Sm3

Rubin - Oil net

N16687

2-feb-2008

BP

Le Havre

44 000

780

354,7

Rubin - Oil net

N16687

2-feb-2008

DONG

Le Havre

44 000

780

635,8

Rubin - Oil net

N16687

2-feb-2008

PETORO

Le Havre

55 000

780

690,8

Rubin - Oil net

N16687

2-feb-2008

TOTAL

Le Havre

67 899

780

339,0

Rubin - Oil net

N16687

2-feb-2008

PPCON

Le Havre

34 877

876

583,2

 

 

Terminal Fiscal Quantities

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Teeside – Oil net

256 000

55 567

582,87

Teeside - Butane

650 000

255 567

582,87

Teeside - Ethane

650 000

255 567

582,87

Teeside - ISO Butane

650 000

255 567

582,87

Teeside - Prophane

650 000

255 567

582,87

 

 

 

 

 

 

Terminal Tank Stock

 

Description

Volume

Mass

Density

Product

Sm3

Tonnes

Kg/Sm3

Teeside - Oil net

2 650 000

2 555 567

582,87

Teeside - Butane

2 650 000

2 555 567

582,87

Teeside - Ethane

2 650 000

2 555 567

582,87

Teeside - ISO Butane

 2 650 000

2 555 567

582,87

Teeside - Prophane

2 650 000

2 555 567

582,87

 

 

 

 

 

Terminal  Import

 

Description

Volume

Mass

Density

Product

Sm3

Tonnes

Kg/Sm3

Teeside - Total Oil net

2 650 000

2 555 567

 

Teeside - Total Gas

0

 

 

Emden - Total Oil net

 

 

 

Emden - Total Gas

 2 650 000

2 555 567

582,87

 

 

 

 

 

Terminal Flare

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Teeside – Total Gas Flare - Gas

10 000

780

0,87

 

 

 

 

 

Terminal Consumption

 

Description

Volume

Mass

Density

 

Sm3

Tonnes

Kg/Sm3

Teeside – Total Gas Fuel - Gas

5 000

780

0,87

Emden – Total Gas Fuel – Gas

3 352

406

0,65

 

 

Terminal Production lifted by tanker

 

Description

Cargo no

Bill of Lading date

Owner

Dest

Volume

Mass

Density

 

 

 

 

 

Sm3

Tonn

Kg/Sm3

Teeside - Oil net

N15687

2-feb-2008

BP

Le Havre

44 000

780

354,7

Teeside - Oil net

N15687

2-feb-2008

DONG

Le Havre

44 000

780

635,8

Teeside - Oil net

N15687

2-feb-2008

PETORO

Le Havre

55 000

780

690,8

Teeside - Oil net

N15687

2-feb-2008

TOTAL

Le Havre

67 899

780

339,0

Teeside - Oil net

N15687

2-feb-2008

PPCON

Le Havre

34 877

876

583,2

Teeside - Ethane

N15796

2-feb-2008

BP

Rotterdam

44 000

780

354,7

Teeside - Ethane

N15796

3-feb-2008

DONG

Rotterdam

44 000

780

635,8

Teeside - Ethane

N15796

3-feb-2008

PETORO

Rotterdam

55 000

780

690,8

Teeside - Ethane

N15796

3-feb-2008

TOTAL

Rotterdam

67 899

780

339,0

Teeside - Ethane

N15796

3-feb-2008

PPCON

Rotterdam

34 877

876

583,2

Teeside - Butane

N10012

5-feb-2008

BP

Raffnes

44 000

780

354,7

Teeside - Butane

N10012

5-feb-2008

DONG

Raffnes

44 000

780

635,8

Teeside - Butane

N10012

5-feb-2008

PETORO

Raffnes

55 000

780

690,8

Teeside - Butane

N10012

5-feb-2008

TOTAL

Raffnes

67 899

780

339,0

Teeside - Butane

N10012

5-feb-2008

PPCON

Raffnes

34 877

876

583,2

 

 

 

 

 

 

 

 

Teeside - ISO Butane

N10013

5-feb-2008

BP

Coryton

44 000

780

354,7

Teeside - ISO Butane

N10013

5-feb-2008

DONG

Coryton

44 000

780

635,8

Teeside - ISO Butane

N10013

5-feb-2008

PETORO

Coryton

55 000

780

690,8

Teeside - ISO Butane

N10013

5-feb-2008

TOTAL

Coryton

67 899

780

339,0

Teeside - ISO Butane

N10013

5-feb-2008

PPCON

Coryton

34 877

876

583,2

Teeside - Prophane

N10014

5-feb-2008

BP

Europor

44 000

780

354,7

Teeside - Prophane

N10014

5-feb-2008

DONG

Europor

44 000

780

635,8

Teeside - Prophane

N10014

5-feb-2008

PETORO

Europor

55 000

780

690,8

Teeside - Prophane

N10014

5-feb-2008

TOTAL

Europor

67 899

780

339,0

Teeside - Prophane

N10014

5-feb-2008

PPCON

Europort

34 877

876

583,2

 

 

 

Well section

 

Well Production

 

Well name

Wellbore name

Oil

Gas

Water

Choke

WHP

Active Period

Wellbore

Status

 

 

Sm3

Sm3

Sm3

%

Bar

days

 

22/7A-04

22/7A-04 A

72 058,5

10 005,5

4566,0

88

46

8,5

Producing

22/7A-05

22/7A-05 B

82 458,0

11 111,1

14566,0

68

146

18,5

Producing

22/7A-06

22/7A-06

22 058,5

88 005,5

24566,0

80

48

12,5

Producing

22/7A-07

22/7A-07 A

12 058,5

89 005,5

34566,0

70

86

24,0

Producing

22/7A-13

22/7A-13 B

9 058,5

768 005,5

466,0

68

76

15,5

Producing

22/7B-08

22/7B-08 C

3 058,5

187 005,5

866,0

58

66

2,5

Producing

22/7B-11

22/7B-11 A

332 058,5

130 005,5

1000,0

99

48

10,5

Producing

22/7B-12

22/7B-12 A

662 058,5

29 546,5

46,0

100

40

18,0

Producing

22/7B-14

22/7B-14

66 058,5

30 705,5

66,0

100

150

22,5

Producing

22/7B-15

22/7B-15 B

542 058,5

100 505,5

56,0

80

360

22,0

Producing

22/7A-06

22/7A-06 A

42 058,5

100 005,5

566,0

80

143

21,0

Producing

 

 

Well Injection

 

Well name

Wellbore name

Co2

Gas

Water

Choke

WHP

Active Period

Wellbore

Status

 

 

Sm3

Sm3

Sm3

%

Bar

days

 

22/7A-04

22/7A-04 A

 2 058,5

10 005,5

4566,0

88

46

 0,5

Injecting

22/7A-05

22/7A-05 B

2 458,0

11 111,1

14566,0

68

246

08,5

Injecting

22/7A-06

22/7A-06 C

2 058,5

88 005,5

24566,0

80

248

1,5

Injecting

22/7A-07

22/7A-07

1 058,5

89 005,5

34566,0

70

386

2,0

Injecting

22/7A-13

22/7A-13 A

058,5

768 005,5

466,0

68

476

15,5

Injecting

22/7B-08

22/7B-08

058,5

187 005,5

866,0

58

566

2,5

Injecting

22/7B-11

22/7B-11 A

332 ,5

130 005,5

1000,0

99

18

11,5

Injecting

22/7B-12

22/7B-12 B

662 ,5

29 546,5

46,0

100

140

1,0

Injecting

22/7B-14

22/7B-14

3 668,5

30 705,5

66,0

100

250

2,5

Injecting

22/7B-15

22/7B-15 B

61 058,5

100 505,5

56,0

80

360

22,0

Injecting

22/7A-06

22/7A-06 A

41 058,5

100 005,5

566,0

80

143

21,0

Injecting