POSC License Agreement
This file is distributed under the POSC License Agreement at
http://www.posc.org/about/license.shtml.
Use of this file constitutes agreement with the POSC License Agreement.
<xsd:documentation>Coiled tubing -The length of tubing from the end of the coil reel to the rotary kelly bushing.
Basically we define what is in the hole and on the reel. This measurement takes into account
the 20 or so feet of tubing that is being straightened and shoved through the injector head.
</xsd:documentation>
<xsd:documentation>Coiled tubing - Umbilical inside, true/false check box so that you can account for the
wireline inside the coiled tubing. With this pressure loss calculation, you can calculate
for the strings used for logging, wire line coring, etc.
Values are "true" (or "1") and "false" (or "0").</xsd:documentation>
<xsd:documentation>Top drive - The distance that the mud travels from the end of the standpipe
hose to the drill pipe connection at the bottom of the top drive. We are measuring the
distance that the mud will flow through the top drive. </xsd:documentation>
<xsd:documentation>Height of flange. If you select Top Drive Stackup Height, Swivel and Kelly
are disabled so that you can specify the top-drive rotary system. </xsd:documentation>