Index: projects/DailyDrillingReport_1.2/XML/HTMLreport/WITSML_drillReport_profiled_schema_2011_01_29.xsd
===================================================================
--- projects/DailyDrillingReport_1.2/XML/HTMLreport/WITSML_drillReport_profiled_schema_2011_01_29.xsd (revision 247)
+++ projects/DailyDrillingReport_1.2/XML/HTMLreport/WITSML_drillReport_profiled_schema_2011_01_29.xsd (revision 262)
@@ -248,15 +248,15 @@
- Operating time spent by bit during the reporting period.
+ Operating time spent by bit during the reporting period (h).
- Measured depth at start of reporting period.
+ Measured depth at start of reporting period (m).
- Measured depth at end of reporting period.
+ Measured depth at end of reporting period (m).
@@ -297,5 +297,5 @@
- Average rate of penetration through Interval.
+ Average rate of penetration through Interval (m/h).
@@ -322,5 +322,5 @@
- Measured depth of hole made current run.
+ Measured depth of hole made current run (m).
@@ -328,5 +328,5 @@
- Hours used on current run.
+ Hours used on current run (m).
@@ -334,5 +334,5 @@
- Total accumulated Measured depth for the entire run.
+ Total accumulated Measured depth for the entire run (m).
@@ -340,5 +340,5 @@
- Total accumulated Hours of drilling for the entire run.
+ Total accumulated Hours of drilling for the entire run (h).
@@ -346,5 +346,5 @@
- Total accumulated Rate of penetration for the entire run.
+ Total accumulated Rate of penetration for the entire run (m/h).
@@ -375,5 +375,5 @@
- Type of cement job.
+ Type of cement job (e.g. primary, plug, squeeze, uknown).
@@ -399,5 +399,5 @@
- Volume of returns.
+ Volume of cement slurry returns (m3).
@@ -437,5 +437,5 @@
- Time pressure released.
+ Time when pressure was released.
@@ -484,5 +484,5 @@
- Pressure plug bumped.
+ Pressure plug bumped (bar).
@@ -561,5 +561,5 @@
- Fluid description.
+ Classification of fluid type (e.g. Mud, Wash, Spacer, Slurry).
@@ -573,5 +573,5 @@
- Mix Water Ratio.
+ Mix Water Ratio (gal/sack).
@@ -589,5 +589,5 @@
- Volume Pumped.
+ Volume of cement slurry pumped (m3).
@@ -597,5 +597,5 @@
- Yield point (Bingham and Herschel Bulkley models).
+ Yield point (Bingham and Herschel Bulkley models) (ft3/sack).
@@ -626,5 +626,5 @@
- Test thickening time.
+ Thickening time (h).
@@ -635,5 +635,5 @@
- Test free water na: = mL/250ML.
+ Percent of free water in a cement slurry (%)
@@ -2306,5 +2306,5 @@
- The type of tubular (e.g., casing, tubing, liner, packer, open hole, other).
+ The type of tubular (e.g., c=casing, t=tubing, l=liner).
@@ -2312,5 +2312,5 @@
- The inside diameter of the tubular used.
+ The inside diameter of the tubular used (in).
@@ -2318,5 +2318,5 @@
- The outside diameter of the tubular used.
+ The outside diameter of the tubular used (in).
@@ -2324,5 +2324,5 @@
- The weight per length of the tubular.
+ The weight per length of the tubular (pound/ft).
@@ -2342,5 +2342,5 @@
- Length measured along string.
+ Length measured along string (m).
@@ -2348,10 +2348,10 @@
- The measured depth of the top of the tubular.
+ The measured depth of the top of the tubular (m).
- The measured depth of the bottom of the tubular.
+ The measured depth of the bottom of the tubular (m).
@@ -2377,5 +2377,5 @@
- The casing type used in this tubular job stage.
+ The casing type used in the tubular section. (e.g. top, intermediate, production)