Index: projects/DailyDrillingReport_1.2/XML/HTMLreport/WITSML_drillReport_profiled_schema_2011_01_29.xsd
===================================================================
--- projects/DailyDrillingReport_1.2/XML/HTMLreport/WITSML_drillReport_profiled_schema_2011_01_29.xsd (revision 153)
+++ projects/DailyDrillingReport_1.2/XML/HTMLreport/WITSML_drillReport_profiled_schema_2011_01_29.xsd (revision 159)
@@ -513,25 +513,25 @@
- primary
+
- plug
+
- squeeze
+
- unknown
+
- other
+
@@ -661,20 +661,20 @@
- Mud
+
- Wash
+
- Spacer
+
- Slurry
+
@@ -2365,5 +2365,5 @@
-
+
@@ -2401,5 +2401,11 @@
-
+
+
+ Date time of end of this stimulation stage.
+ (A 'point in time' when the activity of placing the actual section of casing,
+ lining or tubing was in the 'wellbore' was completed.)
+
+
@@ -2509,15 +2515,15 @@
- Top
+
- Intermediate
+
- Production
+