WITSML | ||||||||
---|---|---|---|---|---|---|---|---|
Operations Report | ||||||||
Well uid: |
Well Name: | |||||||
Wellbore uid: |
Report uid: | |||||||
Wellbore Name: |
Report Name: | |||||||
Report date:
|
Days Oper.:
|
DFS:
|
Days Rig on Loc:
|
|||||
MD:
|
TVD:
|
Distance drilled:
|
Drilling time:
|
|||||
MD Plan:
|
Avg ROP:
|
ROP at Rpt time:
|
||||||
Supervisor:
|
Engineer:
|
Geologist:
|
||||||
Rot Hours:
|
Time from start of bit run: |
Sliding:
|
Circulating:
|
Reaming:
|
||||
Distance: |
Drilled Rot.:
|
Drilled Sliding:
|
Reamed:
|
Hold Drilling:
|
Steering:
|
|||
POB: |
Total:
|
Contractor:
|
Operator:
|
Service Co.:
|
||||
AFE No.:
|
Daily: |
Cost:
|
Mud Cost:
|
Hole Size:
|
Hole Cond.:
|
|||
Lithology:
|
Formation:
|
|||||||
Last casing: |
dia.:
|
md:
|
tvd:
|
LOT TVD:
|
Tub. Assy:
|
|||
Leak off test EMW:
|
Kick tol. press.:
|
Kick tol. vol.:
|
MAASP.:
|
|||||
24 hr summary:
|
||||||||
24 hr Forecast:
|
||||||||
Curr. status:
|
||||||||
Activity Breakdown | ||||||||
Day Costs | ||||||||
Health, Safety, and Environmental Data | ||||||||
Drilling Parameters | ||||||||
Trajectory Stations | ||||||||
Pit Volumes | ||||||||
Pit:
|
Vol. taken:
|
Vol.:
|
Density:
|
Funnel vis.:
|
||||
Description:
|
||||||||
Mud Volumes | ||||||||
Mud Inventory | ||||||||
Bulk | ||||||||
Pump Operations | ||||||||
Pump:
|
Measured:
|
Type oper.:
|
||||||
Liner id.:
|
Stroke len.:
|
Stroke rate:
|
||||||
Pump press.:
|
Efficiency:
|
Pump o/p:
|
Bit md:
|
|||||
Shaker Operations for shaker:
|
||||||||
Slow Circulation Rates (SCR) | ||||||||
Incidents | ||||||||
Personnel | ||||||||
Support Craft:
|
||||||||
Rig Response | ||||||||
Weather | ||||||||
Common Data | ||||||||
Creation Time Stamp: |
Last Chg Time Stamp: |
State: | ||||||
Comments: |