WITSML cementJob Data Object
WITSML
Cement Job Information
uidWell: Well Name:
uidWellbore: uid:
Wellbore Name: Cement Job Name:
Job date: Job type: Job config.:
Cemented string: Work string:
Contractor: Cement Engr: Offshore?: MD water: Returns to seabed?: Reciprocating?:
Wait on cement: MD top plug: MD bot. plug: MD hole: MD shoe: TVD shoe:
MD cement string shoe: TVD cement string shoe:
Plug type: Cementing string: Plug set:
Cement drilled out?: Date drilled out:
Type squeeze: MD Squeeze: Squeeze date:
Tool company: Tool type:
Pipe rotation: Start time: End time:
RPM: Initial torq.: Avg torg.: Max torg.:
Pipe reciprocation: Start time: End time:
RPM: Stroke length: Overpull: Slackoff: Coil tbg used?:
Wellbore Geometry
Cement Stage
Cement Test
Common Data
Creation Time Stamp: Last Chg Time Stamp: State:
Comments:
Stage no: Type: MD top of cement: MD bot. of cement: Mixing started: Pumping started: Pumping ended: Start displacing cement: Vol. excess: Displacement: - Avg rate: - Max rate: - Final press.: Vol. returns: Mud circulation: Time before job: Mud rate: Pressure: Final displ. pump rate: Annular flow after displ.: Squeeze Obj.: Squeeze obtained?: MD string: MD Tool: MD coil tbg: Vol. inside csg: Vol. outside csg: Tail pipe used? Tail pipe dia.: Perforated tail pipe: Tubing pressure: at start: at end: Casing pressure: at start: at end: Back press. applied when pumping Pressure: CTU start: CTU end: Breakdown: pressure: rate: Squeeze pressure: avg: final: held?: left on pipe: time press. held: Squeeze rate: avg: max: Pump rate: at start: at end: Pill below plug? Plug catcher?: Circulate: out MD: prior to start: Mud: type in hole: wgt.: funnel visc: plastic visc.: yield point: Gel 10 sec: Gel 10 min: Bottom hole: circ. temp: static temp: Method to est. excess vol.: Mix Method: Dens. meas. method: Fluid returns? Top plug used?: Bottom plug used?: No. of bot. plugs: Plug bumped?: Pressure: prior to bump: of bump: held to: Float held?: Total mud lost: Fluid displaced: Dens. of displ fluid: Vol. of displ fluid: Cementing Fluid Information Fluid index: Type: Descr.: Purpose: Slurry class: MD at top of slurry: MD at bot. of slurry: Water source: Water vol.: Cement vol.: Mix water ratio: Fluid/Slurry vol.: Excess Pct: Slurry yield: Slurry density: Solid vol. fraction: Vol. pumped: Vol. other: Rheological model: Viscosity: Yield point: Power law index: Consistency index: Gel reading: 10 sec read.: 1 min read.: 10 min read.: Gel strength: 10 sec stren.: 1 min stren.: 10 min stren.: Base fluid: Type: Density: Dry blend: name: desc: mass: density: wgt per sack: Foam used?: Type: Vol. used: Const. gas ratio: avg: dens: init. ratio: final ratio: avg. dens.: Test thickening: time: temp: press.: consist.: Test free water: ratio: temp: Test fluid loss: vol.: temp.: press: period: API fluid loss: Compress. stren.: time 1: time 2: press 1: press 2: temp 1: temp 2: Slurry dens at press.: Vol. reserved: Tot. slurry vol.: Cement Pump Schedule Cement Additive Name: Type: Form: Density: Additive amt: Type concen.: Concentration: Weight per Sack: Volume per Sack: Pump period: Pump rate: Vol. pumped: Pump stroke: Back pressure: Shutdown period: Comments: Test press.: Test period: Cem. between shoe and collar?: Cet run?: Cet bond qual?: Cem. bond log: run?: qual?: CBL under press: Temp survey run?: Hrs before log run, after cem.: Form. press.: PIT tool name: eTime to PIT start: MD top cement: Method to deter. top: TOC suff.?: Job rating: Remedial cem. reqd?: No. of remedials: Failure method: Liner top: Liner length: Hrs before liner top test: MD DV Tool: Test neg.: Tool: EMW: Test pos.: Tool: EMW: User ID: Time Stamp: State: Comments: