2011-04-06
14:08:03
2011-04-06T14:08:03
2011-04-06
12:08:03
2011-04-06T12:08:03
Report header
Summary report Wellbore:
End time:
Wellbore info
Report Number:
Period:
Wellbore:
Wellbore Id:
Status:
Created date:
Operator:
Drilling contractor:
Rig name:
NPD Rig Id:
Spud date:
Date Well Complete:
Elevation RKB-MSL
:
Water depth MSL
:
Tight well:
yes
no
High pressure - High temperature
yes
no
Pressure
:
Temperature
:
Fixed rig
yes
no
Wellbore type:
Depth at Kick Off mMD:
Depth at Kick Off mTVD:
Depth mMD:
Depth mTVD:
Plug Back Depth mMD:
Dist Drilled
:
Penetration Rate
:
Hole Dia
:
Pressure Test Type:
Formation Strength
:
Depth At Formation Strength mMD:
Depth At Formation Strength mTVD:
Dia Last Casing
:
Depth At Last Casing mMD:
Depth At Last Casing mTVD:
Summary of activity
Summary of Activities (24 Hours)
Summary of Planned Activities
Summary of Planned Activities (Next 24 Hours)
Operations
Operation
Start Time
End Time
Start Depth
mMD
End Depth
mMD
Depth
mMD
Main - Sub Activity
State
Remark
Equipment failure info
Equipment Failure Information
Start
Depth
mMD
Depth
mTVD
Sub Equip Syst Class
Operation Downtime
Equipment Repaired
Equip Failure Description
Bit Record
Bit Record
Bit size
Run No
Manufacturer
Model
Hours drilled
MD Start
MD end
Hole made (last 24H)
Hours drilled (last 24H)
ROP
Total hole made
Total hours drilled
Total ROP
Dull grade
Casing/Liner/Tubing
Casing/Liner/Tubing information
Type of pipe
Casing type
Run time
Nominal outside diameter
Nominal inside diameter
Nominal Weight
Nominal Grade
Nominal Connection
Length
MD Top/Hangar
MD Bottom/Shoe
Description
Cement info
Cement information
Start time
End time
Job type
Casing string diameter
Top plug used
Bottom plug used
Plug bumped
Plug bump pressure
Float held
Pressure release time
Full returns
Cement volume returns
Reciprocated
Rotated
Comments
yes
no
yes
no
yes
no
yes
no
yes
no
yes
no
yes
no
Cement Fluid Information
Fluid type
Volume pumped
Fluid densitiy
Yield point
Mix water ratio
Free water
Thickening time
Fluid Description
Comments
Pore pressure
Pore Pressure
Reading
Equ Mud Weight
Time
Depth
mMD
Depth
mTVD
Survey Station
Survey Station
Depth
mMD
Depth
mTVD
Inclination
Azimuth
Log Information
Log Information
Logging Company:
Run no
Depth Top
mMD
Depth Bottom
mMD
Tool
BHCT
BHST
Core Information
Core Information
Core no
Depth Top
mMD
Depth Bottom
mMD
Core length
Recover core
Core barrel length
Inner barrel type
Description
Well Test Information
Well Test Information
Time
Test no
Type
Depth Top
mMD
Depth Bottom
mMD
Choke orifice Size
Density crude oil
Oil flow rate
Gas flow rate M
Water flow rate
Shut in pressure
Flow pressure
Bottom hole pressure
Gas oil ratio
Water oil ratio
Chloride content
CO2 content
H2S content
Formation Test
Formation Test
Depth
mMD
Formation pore pressure
Good seal ind
Depth to sample point
Dominate fluid component
HC Component density
Sample volume
Description
yes
no
Stratigraphic Information
Stratigraphic Information
Depth to top of formation
mMD
Depth to top of formation
mTVD
Formation name
Lithology Information
Lithology Information
Start Depth
mMD
End Depth
mMD
Difference in Depth
mMD
Start Depth
mTVD
End Depth
mTVD
Difference in Depth
mTVD
Shows Description
Lithology Description
Well Control Incident
Well Control Incident
Date
Depth of well
mMD
Depth of well
mTVD
Lost time
Time for well control regain
Depth at bit
mMD
Drilling fluid density
Pore pressure
Depth to casing
mMD
Gained vol of Fluid
Shut in casing pressure
Shut in drill pipe pressure
Incident class
Killing procd
Formation
BHT
Perforation Information
Perforation Information
Time of opening well perf
Time of closing well perf
Duration well perf
Top of perf
mMD
Bottom of Perf
mMD
Top of perf
mTVD
Bottom of Perf
mTVD
Gas Reading Information
Gas Reading Information
Time
Class
Depth to top
mMD
Depth to bottom
mMD
Depth to top
mTVD
Depth to bottom
mTVD
Highest gas
Lowest gas
C1
C2
C3
IC4
IC5
0
31
59
90
120
151
181
212
243
273
304
334
365
Janvier;Jan
Février;Fév
Mars;Mar
Avril;Avr
Mai;Mai
Juin;Jui
Juillet;Juil
Août;Aoû
Septembre;Sep
Octobre;Oct
Novembre;Nov
Décembre;Déc
Januar;Jan
Februar;Feb
März;Mär
April;Apr
Dürfen;Dür
Juni;Jun
Juli;Jul
August;Aug
September;Sep
Oktober;Okt
November;Nov
Dezember;Dez
Enero;Ene
Febrero;Feb
Marzo;Mar
Abril;Abr
Mayo;May
Junio;Jun
Julio;Jul
Agosto;Ago
Septiembre;Sep
Octubre;Oct
Noviembre;Nov
Diciembre;Dic
januari;jan
februari;feb
maart;maa
april;apr
mei;mei
juni;jun
juli;jul
augustus;aug
september;sep
oktober;okt
november;nov
december;dec
January;Jan
February;Feb
March;Mar
April;Apr
May;May
June;Jun
July;Jul
August;Aug
September;Sep
October;Oct
November;Nov
December;Dec
Dimanche;Dim
Lundi;Lun
Mardi;Mar
Mercredi;Mer
Jeudi;Jeu
Vendredi;Ven
Samedi;Sam
Sonntag;Son
Montag;Mon
Dienstag;Die
Mittwoch;Mit
Donnerstag;Don
Freitag;Fre
Samstag;Sam
Domingo;Dom
Lunes;Lun
Martes;Mar
Miércoles;Mié
Jueves;Jue
Viernes;Vie
Sábado;Sáb
zondag;zon
maandag;maa
dinsdag;din
woensdag;woe
donderdag;don
vrijdag;vri
zaterdag;zat
Sunday;Sun
Monday;Mon
Tuesday;Tue
Wednesday;Wed
Thursday;Thu
Friday;Fri
Saturday;Sat
Z
'
Invalid token in format string:
AD
BC
PM
AM
UTC
UTC
7