root / projects / DailyDrillingReport_1.1 / XML / TestReport / Report for NO 72235-1 on 2009-01-13.xml

Revision 5, 14.2 kB (checked in by margs, 15 years ago)

moving old files into new repository.

Line 
1<?xml-stylesheet type="text/xsl" href="ddr_HTML_Report.xsl"?>
2<witsml:drillReports version="1.3.1.0(NPD)" xmlns:witsml="http://www.witsml.org/schemas/131" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/131 http://www.npd.no/schema/CDRS/131/WITSML_DrillReport_Norwegian_Profiled_Schema.xsd"><witsml:documentInfo><witsml:DocumentName>Drill Report</witsml:DocumentName><witsml:Owner>IIP</witsml:Owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 7223/5-1</witsml:nameWell><witsml:nameWellbore>NO 7223/5-1</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2009-01-12T06:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T06:00:00</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2009-01-13T12:01:20</witsml:createDate><witsml:wellAlias><witsml:name>7223/5-1</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias><witsml:wellboreAlias><witsml:name>7223/5-1</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5960</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreInfo><witsml:operator>StatoilHydro</witsml:operator><witsml:drillContractor>Transocean</witsml:drillContractor><witsml:rigAlias><witsml:name>POLAR PIONEER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>289333</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo><witsml:statusInfo><witsml:dTim>2009-01-13T00:00:00</witsml:dTim><witsml:md uom="m">385</witsml:md><witsml:tvd uom="m">385</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">2549</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">2.87</witsml:strengthForm><witsml:mdStrengthForm uom="m">1109</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1109</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">1109</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">1109</witsml:tvdCsgLast><witsml:presTestType>leak off test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">23</witsml:elevKelly><witsml:sum24Hr>WOW. Ran in with the 30&quot; casing cutting assembly. Unable to enter the 20 casing with the BHA. POOH and changed the non rotating stab sleeve from 17 1/2 to 12 1/4&quot;. Ran in and stabbed in. Latched the rotating spear in the 30 caing. Cut the 30&quot; casing. Pulled the casing free with 75 tons overpull. POOH and landed the 30&quot; c/w the PGB on the carrier. Released the 30&quot; casing from the PGB.</witsml:sum24Hr><witsml:forecast24Hr>Lay down the 30&quot; casing. Pull anchors. Deballast rig.
3Status target at 06:00 hrs tomorrow morning: Pull anchors.  </witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo><witsml:activity><witsml:dTimStart>2009-01-12T06:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T10:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on weather. Meanwhile performed general rig maintenance.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T10:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T11:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Made up a x-over and 1 stand of DP to the 30&quot; casing cutting assymbly and tested the cutters in the moonpool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T11:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T12:30:00</witsml:dTimEnd><witsml:md uom="m">207</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Ran in with the 30&quot; casing cutting assembly from surface to 207m on the BHA from the derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T12:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T13:00:00</witsml:dTimEnd><witsml:md uom="m">352</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>RIH with the BHA on 5 1/2&quot; DP from 207m to 352m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T13:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T17:30:00</witsml:dTimEnd><witsml:md uom="m">352</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on the weather to improve enough to be able to launch the ROV.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T17:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T18:30:00</witsml:dTimEnd><witsml:md uom="m">352</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Launched the ROV and positioned the rig.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T18:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T19:00:00</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Stabbed the BHA in to the conductor and attempted to lower the BHA into postion- stood up 1,4 m high. Suspected the 17 1/2&quot; non rotating stab stood up on top of the 20&quot; casing cut.  Worked the string up and down several times with and witout rotation and attempted to enter the 20&quot; casing - no go.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T19:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T19:30:00</witsml:dTimEnd><witsml:md uom="m">207</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>operation failed</witsml:stateDetailActivity><witsml:comments>POOH to the top of the BHA. Laid down the drilling pup after the first stand of 5 1/2&quot; DP.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T19:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T20:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>operation failed</witsml:stateDetailActivity><witsml:comments>POOH and racked the BHA in the derrick. Meanwhile the ROV searched and located the the hydraulic cylinder for the X-mas tree guide system door lost overboard 05.01.2009.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T20:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T21:30:00</witsml:dTimEnd><witsml:md uom="m">207</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>operation failed</witsml:stateDetailActivity><witsml:comments>Changed the 17 1/2&quot; sleeve on the non rotating stab to 12 1/4&quot; and RIH with the BHA from the derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T21:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T23:00:00</witsml:dTimEnd><witsml:md uom="m">352</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>operation failed</witsml:stateDetailActivity><witsml:comments>RIH with the BHA on 5 1/2&quot; DP. Installed the drilling pup. Positioned the rig and stabbed in to the 30&quot; conductor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T23:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T00:00:00</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lathed the rotating spear in the 30&quot; casing and applied 7-10 tons overpull. Cut the 30&quot; casing at 367m with 100 rpm/9-16 kNm and 665-758 lpm/62-75 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T00:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T00:30:00</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut the 30&quot; casing at 367m with 100 rpm/9-16 kNm and 665-758 lpm/62-75 bar holding 7-10 tons overpull on the rotating spear. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T00:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T01:00:00</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Observed the pressure drop from 75 bar to 32 bar and the torque dropped from 16 kNm to 9 kNm indicating the 30&quot; casing cut after 1 1/2 hrs. Increased the flow from 758 lpm to 1050 lpm and continued to cut for another 5 min. Stopped the rotation and the pumps and pulled the casing free with 75 tons overpull.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T01:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T01:30:00</witsml:dTimEnd><witsml:md uom="m">207</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with the PGB and the 30&quot; casing to the top of the BHA. Laid down the drilling pup after the first stand of 5 1/2&quot; DP.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T01:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T02:00:00</witsml:dTimEnd><witsml:md uom="m">15</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH and racked the BHA in the derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T02:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T02:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Landed the PGB c/w the 30&quot; casing stump on the BOP carrier. Held pre-job meeting and installed sea fastening on the PGB. Released the spear from the 30&quot; casing with downward movement and 1/4 turn to th right. Pulled the cutter assembly to the drill floor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T02:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T03:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Broke out and laid down the cutting/pulling assembly.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T03:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T04:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held pre-job meeting. Picked up and made up the 30&quot; CART.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T04:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T06:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lowered the 30&quot; CART in to the 30&quot; housing and made up same with 5 turns to the left. Picked up the weight of the guidebase. Installed two stud bolts in the drive sleeve and pushed in the drive sleeve shear pins. Installed two eyebolts in the drive sleeve and lifted the drive sleeve 1&quot; with two winches. Set down the weight of PGB and lowered the 30 &quot; conductor 15 cm. Removed one bolt from the latch ring buckle. Installed eight release bolts in the latch ring and expanded the ring. Had problems with ice in the boltholes and the cavities during the relasing operations of the 30 &quot; casing. Picked up the 30&quot; housing out of the PGB.Pulled the 30&quot; casing to the drill floor.</witsml:comments></witsml:activity></witsml:drillReport></witsml:drillReports>
Note: See TracBrowser for help on using the browser.